US Route 169 A $13.6 million contract awarded in May 2012 to Pyramid to replace deteriorated sections of a wall that supports Route 169's northbound…Read More
I-470 Emergency Repairs In early July of 2010 during a routine inspection by MoDOT engineers damage was discovered from a settlement causing a wall to…Read More
I-470 at 350 Highway project included 1.8 miles of grading, alternate bid pavement, and Bridges from Pryor Road to Douglas Street in Lee’s Summit,…Read More
Pedestrian Bridges Pyramid has placed several pedestrian bridges. This type of project usually involves removal of the old bridge as one-piece, and replacing it with…Read More
Thanks to the extraordinary teamwork and efforts of hundreds of transportation engineers, designers and construction workers, we are reopening this vital link 19 days earlier than the contractor's deadline," MoDOT District Engineer Beth Wright
Pyramid was presented with the 2011 Annual Safety Award by The Heavy Constructors Association of the Greater Kansas City Area in recognition of good practice toward encouragement and promotion of Safety in the Construction Industry.
It has been about two months since the EF-5 tornado brought its devastating force down on the Joplin Area. ... Words cannot express the gratitude....towards your organization in providing much needed assistance in clearing streets, right-of-way and parkways in the immediate aftermath of the disaster.
Once again, from the bottom of our hearts, thank you for your assistance.