  Ridgeview Road from k-10 to Prairie Star pkwy Design-Build

Owner: City of Lenexa

Team Members: Pyramid Contractors Inc. / Pfefferkorn Engineering & Environmental

Project Cost: $20,982,8000.00

Overview:

Due to the continued growth in western Lenexa, the need to extend Ridgeview Road, North of it’s existing terminus at K-10 to Prairie Star Parkway became a pressing matter.  With the City already having a preliminary design available for proposers to use, the Design-Build Project was able to maintain a tight schedule, and allow for input from impacted developers and businesses that backed up to the new roadway corridor.

  I-470 Emergency Repair

Owner: Missouri Department of Transportation

Team Members: Pyramid Contractors Inc.  

Project Cost: $6,665,030.15

Great Plains Chapter I.C.R.I.
Repair Project Award Winner Special Projects Category
MoDot West Bound Emergency Repair 2010

Overview:

During routine inspections MoDOT discovered settlement on a highly travelled section of I-470 in the Grandview Triangle/Three Trails Crossing Interchange.  The settlement, at a bridge abutment and retaining wall, eventually gave way to a pavement collapse and the full closure of the section of I-470.  Pyramid was awarded the contract just 14 days following the complete closure of the Highway.  To minimize the potential for future collapse Pyramid worked with the Design Engineer to shore the existing piling and abutment, excavate the new span, and construct a new abutment and span.  To expedite the repairs and the re-opening of the highway Pyramid and the Design Engineer worked as a Design-Build team to share field conditions daily and providing design details as the construction progressed.  Just 51 days after the Highway was closed the Project was completed and opened to traffic.